May 15, 2020

AFT Participates in Possible World Record Drilled Shaft

Recently AFT took part in a big accomplishment on our Honolulu Light Rail Project on Oahu, Hawaii. A possible record drilled shaft was installed by our client Legacy Drilling. The mammoth drilled shaft was 10-feet in diameter, drilled to an astonishing depth of 357.3 feet. It was installed using an oscillator to place full-length temporary casing, excavation by hammer grab, and water as the drilling

May 13, 2020

AFT Completes Container Terminal Upgrade Project in Mexico’s Pacific Coast Port of Manzanillo

Colima, Mexico: Contecon Manzanillo S.A. de C.V. (CMSA), the Mexican subsidiary of International Container Terminal Services, Inc. (ICTSI), undertook a capacity improvement program at the Port of Manzanillo in Mexico to expand Mexico’s gateway on the Pacific coast. AFT, working with one of our long-standing Contractor clients based out of Panama, installed the new foundation piles for the dock.  We performed construction geotechnical services during